The browser you are using is not supported by this website. All versions of Internet Explorer are no longer supported, either by us or Microsoft (read more here: https://www.microsoft.com/en-us/microsoft-365/windows/end-of-ie-support).

Please use a modern browser to fully experience our website, such as the newest versions of Edge, Chrome, Firefox or Safari etc.

PROGRESS OF THE COMMISSIONING OF THE TEST FEL AT MAX-lab

Author

Summary, in English

In a collaboration between MAX-lab and BESSY a test

facility for Harmonic Generation Free Electron Laser is

being constructed at MAX-lab. The setup uses the existing

MAX-lab injector together with a Ti:Sa 263 nm laser

system, used for both the gun and seeding, and an optical

klystron consisting of a modulator, a chicane and a radiator.

The different parts of the system have been installed and

commissioning started during the fall of 2007. In this paper

the progress of the commissioning of the Test FEL and our

initial results are presented.

Department/s

Publishing year

2008

Language

English

Pages

139-141

Publication/Series

Proceedings of EPAC08

Document type

Conference paper

Topic

  • Physical Sciences
  • Natural Sciences
  • Accelerator Physics and Instrumentation

Conference name

EPAC 2008

Conference date

2008-06-23 - 2008-06-27

Conference place

Genoa, Italy

Status

Published