Concrete strategy for the Oresund Tunnel
Author
Summary, in English
This paper gives a short review of the most requirements for the concrete to be used for the 3.510 m long immersed tunnel from Amager (outside Copenhagen Airport) to an artificial double island south of Saltholm (in the middle of Oresund). The basis for the requirements is shortly commented.
Department/s
Publishing year
1997
Language
English
Pages
44-54
Publication/Series
Betonwerk und Fertigteil-Technik / Concrete Precasting Plant and Technology
Volume
63
Issue
11
Document type
Journal article
Publisher
Bauverlag GmbH
Topic
- Materials Engineering
Status
Published
ISBN/ISSN/Other
- ISSN: 0373-4331