The browser you are using is not supported by this website. All versions of Internet Explorer are no longer supported, either by us or Microsoft (read more here: https://www.microsoft.com/en-us/microsoft-365/windows/end-of-ie-support).

Please use a modern browser to fully experience our website, such as the newest versions of Edge, Chrome, Firefox or Safari etc.

Plans for the European Spallation Source Beam Physics Control Software

Author

Summary, in English

The commissioning and operations planning for the European Spallation Source is currently being defined. It is foreseen that the ESS will begin to deliver beam on target by mid 2019, something which is urging a well structured and thought through plan both for commissioning and operations. In this paper we will discuss the plans for beam physics operational software, priorities and software services needed during the different stages of beam commissioning.

Publishing year

2016-06-03

Language

English

Pages

3086-3089

Document type

Conference paper

Topic

  • Electrical Engineering, Electronic Engineering, Information Engineering

Keywords

  • ESS, esss, DTL, drift, Tube, Linac, beam, dynamics, RF, radio, frequency, stabilization, post, couplers, coupler, tuner, tuners, pick, accelerating, sensitivity, tuning, tilt, pmq, permanent, quadrupole, focusing, detuning, mismatch, parameter, matched, twiss, parameters, phase, advance, cooling, stem, stems, compensation, software, emittance, growth, tune, depression, error, study, studies, position, monitor, monitors, steerers, adjust, steerer, rfq, input, alignment, angle, cavity, tank, dipole, static, dynamic, PIC-NIC, PIC-NIR, statistic, statistical, TraceWin, confidence, power, losses, lost, level, longitudinal, transverse, MEBT, medium, beta, high, average, commissioning, xal, control, software, room

Conference name

7th International Particle Accelerator Conference, IPAC 2016

Conference date

2016-05-08 - 2016-05-13

Conference place

Busan, Korea, Republic of

Status

Published