The browser you are using is not supported by this website. All versions of Internet Explorer are no longer supported, either by us or Microsoft (read more here: https://www.microsoft.com/en-us/microsoft-365/windows/end-of-ie-support).

Please use a modern browser to fully experience our website, such as the newest versions of Edge, Chrome, Firefox or Safari etc.

A comparative study of ordinary and mineralised Portland cement clinker from two different production units Part I: Composition and hydration of the clinkers

Author

Summary, in English

Portland cement clinkers from two production units were investigated; Plant 1: ordinary clinker (P1) and clinker mineralised with CaF2+CaSO4 (P1m); Plant 2: ordinary clinker (P2) and two clinkers mineralised with CaF2+CaSO4 (P2m, low SO3 and P2m', high SO3). The chemical composition of the clinkers was determined by X-ray fluorescence, ICP analysis, titration (free lime) and ion selective electrode measurements (F). Observed clinker parameters (LSF, SR, AR, R, wt.% MgO, F, SO3, free lime): P1 (0.96, 2.72, 1.27, 1.04, 0.78, 0.06, 0.64, 0.71); P1m (1.03, 2.21, 1.58, 2.18, 0.87, 0.23, 1.95, 0.69); P2 (1.00, 2.66, 1.72, 0.75, 4.06, 0.20, 1.38, 1.51); P2m (1.01, 2.91, 1.96, 0.90, 3.21, 0.39, 1.72, 2.06); P2m' (0.97, 2.70, 1.84, 1.15, 3.86, 0.42, 2.48, 0.89). The qualitative and quantitative phase compositions were characterised using X-ray powder diffraction, backscattered electron imaging, X-ray microanalysis and elemental mapping, plus optical reflection microscopy. Phases observed in all clinkers were: alite, beta-belite, cubic aluminate, ferrite and free lime. Additional phases observed were: aphthitalite (P1, P2, P2m, P2m'), calcium langbeinite (P1m) and periclase (P2, P2m, P2m'). The clinker composition and texture differ more between the two plants, than between ordinary and mineralised clinker from the same production unit. Laboratory cements were prepared by mixing ground clinker with CaSO(4)(.)2H(2)O. The cements were hydrated in an isothermal calorimeter at 20 degreesC (water/cement weight ratio = 0.5) during 33 h. After 12 h, the laboratory cement based on P1m reached a higher level of reaction than the one based on P1. The P2m and P2m' laboratory cements had a slower reaction than the P2 cement. (C) 2003 Elsevier Ltd. All rights reserved.

Publishing year

2003

Language

English

Pages

1613-1621

Publication/Series

Cement and Concrete Research

Volume

33

Issue

10

Document type

Journal article

Publisher

Elsevier

Topic

  • Chemical Sciences

Keywords

  • Fluoride
  • Clinker
  • Hydration
  • Microstructure
  • Sulfate

Status

Published

ISBN/ISSN/Other

  • ISSN: 0008-8846